About the Canal
The Coventry Canal is one of the earlier British canals - and was planned to move coal from the collieries at Bedworth either down to the Oxford Canal, or up to the Trent & Mersey Canal.
By 1769 the Coventry Canal had been completed between Coventry and Atherstone - but by this point it had run out of funds, and it took an unsual degree of co-operation betweeen canal owner for this canal to be completed in 1789.
This missing link between Atherstone and the Trent & Mersey Canal at Fradley was not just a problem for the Coventry Canal, but also for the owners of a potential new canal (as this link would increase their expected traffic), and for the owners of the Trent & Mersey Canal (who also see a boost to traffic through the completion of this link).
And so an agreement was made, where the owners of the Coventry Canal would continue a little further so that the canal reached Fazeley, the constructors of the new canal would complete the section between Fazeley and Whittingham, and then the owners of the Trent & Mersey Canal would complete the final section from Whtitingham to Fradley.
In the end it was agreed that the new canal would run from Birmingham to Fazeley - and the new Birmingham & Fazeley Canal was completed around the same time as the Coventry Canal, and these new stretches of canal went on to become very busy (and very successful).
The Coventry Canal Company did buy up the stretch between Whittingham and Fradley (from the owner of the Trent & Mersey Canal), but they never bought up the stretch between Fazeley and Whittingham - and as a result on OS Maps that is shown as being part of the Birmingham & Fazeley Canal.
But since having the Coventry Canal being split into two (by a section that was intended to be part of the Coventry Canal) is silly, here we take the view that the whole stretch from Coventry to Fradley is the Coventry Canal, with the Birmingham & Fazeley Canal ending in Fazeley.
But in either case, the canal soon became a key transportation route - as it sat on the main link between Birmingham and London - with this route running along the Birmingham & Fazeley Canal, then along the Coventry Canal, then the Oxford Canal, and finallly the River Thames.
This would change however, with the arriival of the canals that would ultimately combine to form the Grand Union Canal - and the arrival of those canals saw this route be bypassed by the boats heading directly from Birmingham to London.
But trade did continue to flow along the Coventry Canal - as boats used this route to get from the Trent & Mersey Canal, to the a stretch further along on the Grand Union Canal (on a route that also made use of the northern end of the Oxford Canal).
And so the Coventry Canal remained profitable all the way up until it's nationalisation in 1947 - and today it continues to be a very popular boating canal.
Stages
Practicalities
The canal starts on the opposite side of the train station to Coventry, but otherwise getting to Coventry is easy.
From here the canal has nearby train stations at Coventry Arena, Bedworth, Bermuda Park, Nuneaton, Atherstone, Polegate, Tamworth, Wilnecote, and Lichfield. With these covering the length of the canal.
I opted to stay in Nuneaton, and it would have also been easy to stay in Tamworth - although note that whilst Nuneaton Bedworth Travelodge is near the canal, it does require crossing a busy dual carriageway to reach on foot (it is very cheap though).
Useful Links
Canal & River Trust Website: Coventry Canal
LDWA Page: Coventry Canal Walk - LDWA Long Distance Paths